1. TG series installation: the shaft shall be horizontal and perpendicular to the rod head. YG series installation: the hinge shaft should be horizontal and perpendicular to the rod head; The upper and lower trunnion type upper and lower trunnion shall be horizontal and parallel to each other; HSG series installation: the upper and lower ear ring installation shafts should be horizontal and parallel to each other.
2. Clean hydraulic oil shall be used.
3. Do not continue pressurizing when the stroke reaches the specified value to prevent damage to parts.
4. No one is allowed to stand below when the carriage is raised, and no one is allowed to stand around during other operations.